ServiceFrom Rs 25,000 NPR

Electrical Panel Upgrades in Kathmandu

If the main breaker trips when the geyser and microwave run together, your panel is undersized. SDR upgrades residential and commercial distribution boards to modern MCB/RCCB protection with proper labelling and room to grow.

Electrical distribution board panel upgrade in Nepal

Signs your panel needs upgrading

Nuisance tripping, buzzing from the board, hot breaker toggles, old rewireable fuses, or plans to add AC, EV charger or a water heater are all signals the panel has hit its limit. An undersized board is a leading cause of electrical fires — do not keep resetting the breaker without a load check.

  • MCB trips when two heavy appliances run
  • Bulky ceramic fuses or no RCD protection
  • No spare ways for new circuits
  • Renovation adding kitchen, AC or EV loads

What a panel upgrade includes

Site load calculation, new enclosure, main isolator, RCCB/ELCB residual protection, individual MCBs per circuit, proper phase/neutral bars, labelling, and full test results. Where the NEA meter feed is undersized we coordinate the service cable upgrade too.

Panel upgrade cost

Residential DB upgrades start around Rs 25,000 for 100A boards and run to Rs 80,000 for 200A with extra circuits. Commercial three-phase 400A work starts near Rs 80,000. Material brand (Havells, Schneider, Siemens class) affects the final number — you choose the tier before we order.

Panel Upgrades FAQ

How do I know if my panel is too small?

Frequent trips under normal use, warm breaker toggles, or no spare circuit ways are the main signs. We do a free load calculation during the estimate visit.

Can you add circuits during the upgrade?

Yes — most upgrades include spare ways so you can add a geyser, AC or EV charger circuit later without opening the board again.

Do panel upgrades need NEA approval?

Internal board work usually does not. If the meter service size must change, we guide you through the NEA process as part of the project.

Related services

Areas we cover

Guides related to Panel Upgrades

Ready to book panel upgrades?

Free estimate · 30-day labor warranty · Kathmandu Valley

Book now